top of page

Times Square Break Room and Main Display Window.
 

We Removed a folding plastic door and then framed and added windows, a new door and finish to match the interior and exterior of the existing structure.  Rebuilt the Front Window Display with 12" tile as to protect from the high amount of moisture that builds up and the display during window.

 

The Nelson’s Project

Flipped House for Neighbor in Need.

We demolished all lath and plaster then sheet rocked, taped, texture and painted this small home. We also installed the shower and all the cabinets and counter tops in the kitchen. Installed the appliances as well.  In the process of this flip for Dave Snuggs founder of Neighbor in Need.

20131 Grove Street

Meadowood Condo's Painting

Pressure washed and sanded 25 year Color Lock Siding then applied to coats of finish to all walls and metal trim.

The Jefferson’s Lake House
  • Facebook
  • Facebook
bottom of page